Computerized animation of the East Link alignment from Seattle to Redmond at 60% design (March 2014).Aerial footage of the East Link alignment in Bellevue (May 2020). View a comparison of aerial footage captured in May 2020 of the East Link alignment in Bellevue with the animation of the light rail created in 2014 when the project was designed to 60 percent. This segment includes the Judkins Park Station (in Seattle) and the Mercer Island Station (in Mercer Island).Īpproximately five miles of light rail trackway are being built in Bellevue.
0 Comments
Leave a Reply. |